Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

May 13, 2021     39-4 Control System Step 2-5 - (5 hours) Category: Controls
Fabricated the F-1090 Elevator Pushrod (MID) cutting the aluminum tube to size and match drilling the ends with the template provided.
Primed internally and externally. Installed the VA-101 threaded ends and final riveting with pull rivets. Installed rod ends but i DIDNT put the safety wire.
Stored away for final installation.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.